Sparely
DU

CASTABLE,REFRACTORY,LW,1500DEG C

Material 4100074734 · CASTABLE · Plant 1000

AReduceNon-moving
Material
4100074734
Category
CASTABLE
Base unit
KG
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 54 KG/year: 54 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~58 days; expected demand during lead time 8.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 181, order up to 272.
  • 4.Stock 749 exceeds the level to keep (272) by 477.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 5 other material numbers
On hand / on order
749 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
181
safety stock 173
Rec. Max
272
order qty 91
Service level
100.0%
stockout risk now 0%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 381.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 1 functional locations

1 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A253814.58

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
26 Aug 2026MediumPX_BF-103Replace lamp as per PM finding
26 Aug 2026MediumPX_BF-103Hot spot at convection BF-103
03 Aug 2026MediumPX_BF-103Install scaffolding at BF-103
24 Jul 2026MediumPX_BF-103Thermograph wall BF-103
23 Jul 2026EmergencyPX_BF-103Decoking follow up BF-103

Recent goods issues

Never issued in the 17-month history.