CASTABLE,REFRACTORY,LW,1600DEG C
Material 4100075152 · CASTABLE · Plant 1000
AMonitorInsurance gap
- Material
- 4100075152
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 58 d · P80 92 d
- Unit price
- Rp 43,840 (est.)
Recommendation
- 1.Forecast 206 KG/year: 206 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~58 days; expected demand during lead time 33.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 272, order up to 479.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
272
safety stock 240
Rec. Max
479
order qty 207
Service level
99.9%
stockout risk now 30%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 25 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 2 functional locations
2 with criticality A/B · 1,400 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 200 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1,200 | 71 | 28.72 |
Lead time and procurement
Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
Recent goods issues
Never issued in the 17-month history.