CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C
Material 4100075317 · CERAMIC FIBER · Plant 1000
AMonitorStockout
- Material
- 4100075317
- Category
- CERAMIC FIBER
- Base unit
- RL
- MRP type
- Non Stock
- Criticality
- A (7 of 10 FuncLocs A/B)
- Supplier
- KARYA SEJAHTERA NUSANTARA PT
- Lead time
- 62 d · P80 78 d
- Unit price
- Rp 3.1M
Recommendation
- 1.Forecast 170 RL/year: 170 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~62 days; expected demand during lead time 29.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 90, order up to 119.
- 4.Installed on 10 FuncLoc(s), 7 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningConvert to Stock ItemLast turnaround used 45Single sourceAbnormal consumptionOpen POSame description as 7 other material numbers
On hand / on order
0 / 987
next delivery 03 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
90
safety stock 62
Rec. Max
119
order qty 29
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.1M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 50 issue days in the last 180 days, last issue 1 days ago, 99 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 20 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (51 units) excluded from the baseline.
Demand pattern Smooth · 147 issue days · 8 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 56.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.
Installed on 10 functional locations
7 with criticality A/B · 37 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 5 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 4 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 5 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 5 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 5 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 2 | 23 | 9.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 2 | 41 | 14.58 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 4 | 23 | 9.44 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 4 | 8 | 3.02 |
Lead time and procurement
Lead time 62 ± 39 days (PO history, 59 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Sept 2026 | PR03 Regular replenishment | 76 | Rp 3.0M | 21 Oct 2026 open | 29 d |
| 07 Sept 2026 | PR06 Regular replenishment | 143 | Rp 2.9M | 01 Nov 2026 open | 55 d |
| 06 Sept 2026 | PR03 Regular replenishment | 116 | Rp 3.1M | 09 Nov 2026 open | 64 d |
| 03 Sept 2026 | PR06 Regular replenishment | 106 | Rp 2.9M | 28 Oct 2026 open | 55 d |
| 03 Sept 2026 | PR05 Project / turnaround | 51 | Rp 3.1M | 29 Jan 2027 open | 148 d |
| 23 Aug 2026 | PR06 Regular replenishment | 42 | Rp 3.1M | 17 Sept 2026 | 25 d |
| 03 Aug 2026 | PR06 Regular replenishment | 132 | Rp 3.1M | 07 Nov 2026 open | 96 d |
| 02 Aug 2026 | PR10 Other | 71 | Rp 3.0M | 17 Oct 2026 open | 76 d |
| 29 Jul 2026 | PR05 Project / turnaround | 90 | Rp 3.1M | 20 Nov 2026 open | 114 d |
| 19 Jul 2026 | PR03 Regular replenishment | 42 | Rp 3.1M | 05 Sept 2026 | 48 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 1 | 201000007314 | Corrective |
| 30 Sept 2026 | 1 | 201000024363 | Corrective |
| 24 Sept 2026 | 1 | 209000029477 | Other maintenance |
| 23 Sept 2026 | 3 | 204000002989 | Preventive |
| 22 Sept 2026 | 1 | 201000030211 | Corrective |
| 22 Sept 2026 | 1 | 201000037585 | Corrective |
| 18 Sept 2026 | 1 | 201000000904 | Corrective |
| 17 Sept 2026 | 2 | 201000015263 | Corrective |
| 15 Sept 2026 | 1 | 209000036917 | Other maintenance |
| 11 Sept 2026 | 1 | 201000035065 | Corrective |
| 10 Sept 2026 | 1 | 201000021470 | Corrective |
| 08 Sept 2026 | 3 | 201000021806 | Corrective |
| 05 Sept 2026 | 2 | 201000002443 | Corrective |
| 04 Sept 2026 | 1 | 201000031484 | Corrective |
| 04 Sept 2026 | 1 | 204000000488 | Preventive |