CERAMIC FIBER,BLANKET,50T,96KG/M3,1260C

Material 4100075356 · CERAMIC FIBER · Plant 1000

ALong-leadTransferCriticalStockout
Material
4100075356
Category
CERAMIC FIBER
Base unit
RL
MRP type
Non Stock
Criticality
A (6 of 9 FuncLocs A/B)
Supplier
PRIMA INSTRUMEN PERSADA PT
Lead time
74 d · P80 102 d
Unit price
Rp 2.1M

Recommendation

  • 1.Forecast 59 RL/year: 59 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~74 days; expected demand during lead time 12.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 36, order up to 57.
  • 4.On hand 0 + on order 24 is at or below the reorder point: 33 needed.
  • 5.Long lead time: 80% of deliveries took up to 102 days and the fastest seen in its category 25 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
  • 8.Identical part 4100075634 holds spare stock: transfer 33 RL instead of buying — no purchase needed.
Long-leadML early warningConvert to Stock ItemLast turnaround used 8Single sourceAbnormal consumptionOpen POSame description as 3 other material numbers
On hand / on order
0 / 24
next delivery 27 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
36
safety stock 25
Rec. Max
57
order qty 21
Service level
99.9%
stockout risk now 6%
Unit price
Rp 2.1M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 12 issue days in the last 180 days, last issue 5 days ago, 104 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (14 units) excluded from the baseline.

Demand pattern Smooth · 70 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 21.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 9 functional locations

6 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A511442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-112
CRACKING FURNACE BF-112
A37327.01
PX_BF-102
CRACKING FURNACE BF-102
A37128.72
PX_BF-103
CRACKING FURNACE BF-103
A23814.58
PX_BF-107
CRACKING FURNACE BF-107
A2239.01
PX_BF-110
CRACKING FURNACE BF-110
S14114.58
PX_BF-108
CRACKING FURNACE BF-108
S4239.44
PX_BF-101
CRACKING FURNACE BF-101
S483.02

Lead time and procurement

Lead time 74 ± 37 days (PO history, 17 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
22 Sept 2026PR06
Regular replenishment
24Rp 2.1M27 Nov 2026
open
66 d
22 Jun 2026PR03
Regular replenishment
40Rp 2.1M05 Aug 202644 d
15 Jun 2026PR06
Regular replenishment
46Rp 2.2M10 Jul 202625 d
10 May 2026PR06
Regular replenishment
41Rp 2.1M05 Sept 2026118 d
21 Apr 2026PR06
Regular replenishment
45Rp 2.2M13 Jun 202653 d
21 Apr 2026PR06
Regular replenishment
35Rp 2.1M15 Jul 202685 d
08 Jan 2026PR05
Project / turnaround
32Rp 2.2M08 Jul 2026181 d
16 Dec 2025PR06
Regular replenishment
59Rp 2.1M16 Feb 202662 d
02 Dec 2025PR06
Regular replenishment
18Rp 2.1M16 Feb 202676 d
30 Nov 2025PR05
Project / turnaround
34Rp 2.2M02 Feb 202664 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107

Recent goods issues

Posting dateQtyOrderOrder type
26 Sept 20262201000005210Corrective
10 Sept 20261201000027353Corrective
06 Sept 20261203000008243Turnaround
24 Jul 20262201000027503Corrective
23 Jul 20261201000023809Corrective
22 Jun 20261201000023783Corrective
21 Jun 20261201000023783Corrective
06 Jun 20262201000024026Corrective
05 Jun 20261203000002440Turnaround
18 May 20262201000039669Corrective
12 May 20261201000016405Corrective
25 Apr 20261203000034130Turnaround
19 Apr 20263201000004473Corrective
17 Apr 20261201000032200Corrective
15 Apr 20261201000012582Corrective