CERAMIC FIBER,BLANKET,25T,96KG/M3,1430C

Material 4100075392 · CERAMIC FIBER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100075392
Category
CERAMIC FIBER
Base unit
RL
MRP type
Non Stock
Criticality
A (7 of 10 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
67 d · P80 96 d
Unit price
Rp 945,243

Recommendation

  • 1.Forecast 62 RL/year: 62 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~67 days; expected demand during lead time 11.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 36, order up to 68.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 68 now.
  • 5.Long lead time: 80% of deliveries took up to 96 days and the fastest seen in its category 25 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 7 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
  • 8.Identical part 4100076909 holds spare stock: transfer 10 RL instead of buying, then buy the remaining 58.
Proposed purchase requisition
58 RL
Rp 54.8M · order by 01 Oct 2026
Expected arrival ≈ 67 days
Long-leadML early warningConvert to Stock ItemLast turnaround used 12Single sourceAbnormal consumptionSame description as 2 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
36
safety stock 25
Rec. Max
68
order qty 32
Service level
99.9%
stockout risk now 93%
Unit price
Rp 945,243
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 21 issue days in the last 180 days, last issue 4 days ago, 107 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (18 units) excluded from the baseline.

Demand pattern Smooth · 61 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 24.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 10 functional locations

7 with criticality A/B · 35 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A511442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-102
CRACKING FURNACE BF-102
A57128.72
PX_BF-103
CRACKING FURNACE BF-103
A33814.58
PX_BF-109
CRACKING FURNACE BF-109
A32911.58
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-111
CRACKING FURNACE BF-111
A5239.01
PX_BF-110
CRACKING FURNACE BF-110
S24114.58
PX_BF-108
CRACKING FURNACE BF-108
S5239.44
PX_BF-101
CRACKING FURNACE BF-101
S583.02

Lead time and procurement

Lead time 67 ± 38 days (PO history, 23 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
13 Aug 2026PR06
Regular replenishment
21Rp 936,89723 Sept 202641 d
19 Jun 2026PR06
Regular replenishment
38Rp 945,24303 Sept 202676 d
16 May 2026PR01
Import / long-lead
24Rp 928,47102 Sept 2026109 d
09 Mar 2026PR06
Regular replenishment
25Rp 959,58327 Apr 202649 d
16 Feb 2026PR05
Project / turnaround
28Rp 986,44010 Jul 2026144 d
09 Feb 2026PR06
Regular replenishment
49Rp 951,33123 Mar 202642 d
23 Dec 2025PR06
Regular replenishment
33Rp 939,40618 Jan 202626 d
20 Dec 2025PR01
Import / long-lead
39Rp 961,91102 Apr 2026103 d
17 Nov 2025PR03
Regular replenishment
31Rp 964,61502 Feb 202677 d
10 Nov 2025PR01
Import / long-lead
16Rp 922,09522 Jan 202673 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104

Recent goods issues

Posting dateQtyOrderOrder type
27 Sept 20262201000031834Corrective
25 Sept 20261209000029477Other maintenance
23 Sept 20261209000029477Other maintenance
11 Sept 20263201000031756Corrective
09 Sept 20261201000016998Corrective
01 Sept 20261204000037316Preventive
21 Aug 20261204000030403Preventive
28 Jul 20261201000004503Corrective
10 Jul 20261201000029268Corrective
01 Jul 20261201000011761Corrective
29 Jun 20261201000006253Corrective
27 Jun 20262201000029042Corrective
11 Jun 20261201000037853Corrective
04 Jun 20262209000018653Other maintenance
28 May 20264201000023249Corrective