CERAMIC FIBER,BLANKET,50T,128KG/M3,1260C
Material 4100075418 · CERAMIC FIBER · Plant 1000
AReduceExcess
- Material
- 4100075418
- Category
- CERAMIC FIBER
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 50 d · P80 62 d
- Unit price
- Rp 3.7M
Recommendation
- 1.Forecast 30 RL/year: 30 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~50 days; expected demand during lead time 4.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 25.
- 4.Stock 29 exceeds the level to keep (25) by 4.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 11Single sourceAbnormal consumptionSame description as 6 other material numbers
On hand / on order
29 / 0
no open PO
Today Min / Max
12 / 31
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 10
Rec. Max
25
order qty 11
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.7M
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 61 days ago, 59 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (11 units) excluded from the baseline.
Demand pattern Intermittent · 37 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.
Installed on 5 functional locations
4 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1 | 114 | 42.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 2 | 71 | 28.72 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 4 | 29 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 4 | 23 | 9.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 1 | 41 | 14.58 |
Lead time and procurement
Lead time 50 ± 21 days (PO history, 12 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 May 2026 | PR06 Regular replenishment | 14 | Rp 3.8M | 11 Jun 2026 | 40 d |
| 25 Apr 2026 | PR03 Regular replenishment | 27 | Rp 3.6M | 16 Jun 2026 | 52 d |
| 19 Apr 2026 | PR03 Regular replenishment | 27 | Rp 3.8M | 11 Jul 2026 | 83 d |
| 21 Mar 2026 | PR03 Regular replenishment | 9 | Rp 3.7M | 07 May 2026 | 47 d |
| 03 Jan 2026 | PR03 Regular replenishment | 19 | Rp 3.8M | 04 Feb 2026 | 32 d |
| 11 Oct 2025 | PR04 Regular (other) | 20 | Rp 3.8M | 12 Dec 2025 | 62 d |
| 10 Oct 2025 | PR03 Regular replenishment | 18 | Rp 3.6M | 17 Nov 2025 | 38 d |
| 24 Sept 2025 | PR03 Regular replenishment | 9 | Rp 3.8M | 14 Oct 2025 | 20 d |
| 10 Sept 2025 | PR03 Regular replenishment | 16 | Rp 3.6M | 06 Oct 2025 | 26 d |
| 31 Aug 2025 | PR03 Regular replenishment | 11 | Rp 3.9M | 04 Nov 2025 | 65 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Aug 2026 | 1 | 201000006205 | Corrective |
| 22 Jul 2026 | 1 | 206000019677 | Other maintenance |
| 07 Jul 2026 | 4 | 201000030618 | Corrective |
| 07 May 2026 | 2 | 201000016546 | Corrective |
| 05 May 2026 | 1 | 201000011178 | Corrective |
| 20 Apr 2026 | 1 | 201000022747 | Corrective |
| 19 Mar 2026 | 1 | 209000001551 | Other maintenance |
| 03 Mar 2026 | 1 | 201000003936 | Corrective |
| 28 Feb 2026 | 1 | 201000020602 | Corrective |
| 26 Feb 2026 | 1 | 201000000733 | Corrective |
| 18 Feb 2026 | 2 | 201000036075 | Corrective |
| 12 Feb 2026 | 2 | 201000017735 | Corrective |
| 31 Jan 2026 | 1 | 201000022888 | Corrective |
| 31 Jan 2026 | 1 | 204000034161 | Preventive |
| 25 Jan 2026 | 1 | 201000008007 | Corrective |