Sparely
DU

CERAMIC FIBER,BLANKET,50T,128KG/M3,1260C

Material 4100075418 · CERAMIC FIBER · Plant 1000

AReduceExcess
Material
4100075418
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
50 d · P80 62 d
Unit price
Rp 3.7M

Recommendation

  • 1.Forecast 30 RL/year: 30 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~50 days; expected demand during lead time 4.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 25.
  • 4.Stock 29 exceeds the level to keep (25) by 4.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 11Single sourceAbnormal consumptionSame description as 6 other material numbers
On hand / on order
29 / 0
no open PO
Today Min / Max
12 / 31
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 10
Rec. Max
25
order qty 11
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.7M
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 61 days ago, 59 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (11 units) excluded from the baseline.

Demand pattern Intermittent · 37 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 5 functional locations

4 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-102
CRACKING FURNACE BF-102
A27128.72
PX_BF-109
CRACKING FURNACE BF-109
A42911.58
PX_BF-107
CRACKING FURNACE BF-107
A4239.01
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 50 ± 21 days (PO history, 12 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
02 May 2026PR06
Regular replenishment
14Rp 3.8M11 Jun 202640 d
25 Apr 2026PR03
Regular replenishment
27Rp 3.6M16 Jun 202652 d
19 Apr 2026PR03
Regular replenishment
27Rp 3.8M11 Jul 202683 d
21 Mar 2026PR03
Regular replenishment
9Rp 3.7M07 May 202647 d
03 Jan 2026PR03
Regular replenishment
19Rp 3.8M04 Feb 202632 d
11 Oct 2025PR04
Regular (other)
20Rp 3.8M12 Dec 202562 d
10 Oct 2025PR03
Regular replenishment
18Rp 3.6M17 Nov 202538 d
24 Sept 2025PR03
Regular replenishment
9Rp 3.8M14 Oct 202520 d
10 Sept 2025PR03
Regular replenishment
16Rp 3.6M06 Oct 202526 d
31 Aug 2025PR03
Regular replenishment
11Rp 3.9M04 Nov 202565 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026LowPX_BF-105Install cover plate BF-105

Recent goods issues

Posting dateQtyOrderOrder type
01 Aug 20261201000006205Corrective
22 Jul 20261206000019677Other maintenance
07 Jul 20264201000030618Corrective
07 May 20262201000016546Corrective
05 May 20261201000011178Corrective
20 Apr 20261201000022747Corrective
19 Mar 20261209000001551Other maintenance
03 Mar 20261201000003936Corrective
28 Feb 20261201000020602Corrective
26 Feb 20261201000000733Corrective
18 Feb 20262201000036075Corrective
12 Feb 20262201000017735Corrective
31 Jan 20261201000022888Corrective
31 Jan 20261204000034161Preventive
25 Jan 20261201000008007Corrective