CERAMIC FIBER,BLANKET,50T,128KG/M3,1430C
Material 4100075468 · CERAMIC FIBER · Plant 1000
AMonitorHealthy
- Material
- 4100075468
- Category
- CERAMIC FIBER
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 38 d · P80 39 d
- Unit price
- Rp 1.3M
Recommendation
- 1.Forecast 26 RL/year: 26 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~38 days; expected demand during lead time 2.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 29.
- 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 98% probability of demand in the next 90 days.
ML early warningLast turnaround used 3Single sourceAbnormal consumptionOpen POSame description as 4 other material numbers
On hand / on order
6 / 17
next delivery 15 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 9
Rec. Max
29
order qty 18
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 18 days ago, 32 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Lumpy · 27 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.
Installed on 3 functional locations
2 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 5 | 28 | 11.58 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 3 | 23 | 9.44 |
Lead time and procurement
Lead time 38 ± 18 days (PO history, 10 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Sept 2026 | PR03 Regular replenishment | 17 | Rp 1.3M | 15 Oct 2026 open | 36 d |
| 02 Jun 2026 | PR06 Regular replenishment | 12 | Rp 1.3M | 19 Jul 2026 | 47 d |
| 20 Apr 2026 | PR03 Regular replenishment | 8 | Rp 1.4M | 15 May 2026 | 25 d |
| 27 Feb 2026 | PR03 Regular replenishment | 8 | Rp 1.3M | 25 Apr 2026 | 57 d |
| 21 Feb 2026 | PR03 Regular replenishment | 12 | Rp 1.3M | 12 Mar 2026 | 19 d |
| 20 Feb 2026 | PR03 Regular replenishment | 19 | Rp 1.4M | 19 Jan 2026 | 1 d |
| 10 Jan 2026 | PR06 Regular replenishment | 10 | Rp 1.3M | 15 Feb 2026 | 36 d |
| 09 Jan 2026 | PR06 Regular replenishment | 18 | Rp 1.4M | 21 Jan 2026 | 12 d |
| 20 Dec 2025 | PR03 Regular replenishment | 6 | Rp 1.4M | 26 Jan 2026 | 37 d |
| 15 Dec 2025 | PR03 Regular replenishment | 21 | Rp 1.3M | 12 Jan 2026 | 28 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Sept 2026 | 1 | 201000010974 | Corrective |
| 09 Aug 2026 | 1 | 201000013778 | Corrective |
| 13 Jun 2026 | 1 | 201000008577 | Corrective |
| 12 Jun 2026 | 1 | 201000023717 | Corrective |
| 07 Jun 2026 | 1 | 201000033234 | Corrective |
| 21 May 2026 | 1 | 201000022307 | Corrective |
| 02 May 2026 | 1 | 201000020678 | Corrective |
| 17 Apr 2026 | 2 | 201000022606 | Corrective |
| 09 Feb 2026 | 2 | 204000016349 | Preventive |
| 05 Feb 2026 | 1 | 201000018578 | Corrective |
| 28 Jan 2026 | 1 | 201000004187 | Corrective |
| 27 Jan 2026 | 1 | 201000029446 | Corrective |
| 26 Jan 2026 | 1 | 201000027275 | Corrective |
| 24 Jan 2026 | 1 | 204000005718 | Preventive |
| 19 Jan 2026 | 2 | 201000039436 | Corrective |