Sparely
DU

CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C

Material 4100075497 · CERAMIC FIBER · Plant 1000

ALong-leadMonitorHealthy
Material
4100075497
Category
CERAMIC FIBER
Base unit
RL
MRP type
Non Stock
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
77 d · P80 101 d
Unit price
Rp 2.5M

Recommendation

  • 1.Forecast 30 RL/year: 30 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~77 days; expected demand during lead time 6.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 35.
  • 4.Long lead time: 80% of deliveries took up to 101 days and the fastest seen in its category 25 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemLast turnaround used 5Single sourceAbnormal consumptionOpen POSame description as 7 other material numbers
On hand / on order
13 / 25
next delivery 02 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 15
Rec. Max
35
order qty 14
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.5M
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 9 issue days in the last 180 days, last issue 1 days ago, 84 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Erratic · 24 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 6 functional locations

5 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A411442.86
PX_BF-106
CRACKING FURNACE BF-106
A48230.86
PX_BF-112
CRACKING FURNACE BF-112
A27327.01
PX_BF-102
CRACKING FURNACE BF-102
A37128.72
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-108
CRACKING FURNACE BF-108
S3239.44

Lead time and procurement

Lead time 77 ± 39 days (PO history, 15 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR05
Project / turnaround
16Rp 2.4M06 Jan 2027
open
113 d
25 Jul 2026PR06
Regular replenishment
9Rp 2.5M02 Oct 2026
open
69 d
11 Jun 2026PR04
Regular (other)
9Rp 2.5M22 Aug 202672 d
20 Feb 2026PR06
Regular replenishment
16Rp 2.5M17 Apr 202656 d
23 Jan 2026PR03
Regular replenishment
18Rp 2.6M21 Mar 202657 d
22 Jan 2026PR06
Regular replenishment
9Rp 2.6M04 Mar 202641 d
22 Jan 2026PR06
Regular replenishment
12Rp 2.5M19 Mar 202656 d
22 Nov 2025PR03
Regular replenishment
18Rp 2.6M28 Feb 202698 d
23 Oct 2025PR06
Regular replenishment
8Rp 2.6M14 Dec 202552 d
14 Oct 2025PR06
Regular replenishment
13Rp 2.6M19 Feb 2026128 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000010018Corrective
22 Sept 20261209000029477Other maintenance
24 Jul 20262201000002081Corrective
26 Jun 20261201000033706Corrective
12 Jun 20261201000023683Corrective
27 May 20261201000002230Corrective
10 May 20261201000011420Corrective
08 May 20261201000010542Corrective
04 May 20262201000036238Corrective
21 Mar 20261201000005983Corrective
04 Mar 20261201000011654Corrective
22 Jan 20262201000008172Corrective
08 Jan 20261201000024178Corrective
08 Jan 20263201000031110Corrective
06 Jan 20262201000024982Corrective