CERAMIC FIBER,BLANKET,25T,128KG/M3,1260C

Material 4100075529 · CERAMIC FIBER · Plant 1000

AMonitorHealthy
Material
4100075529
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
39 d · P80 42 d
Unit price
Rp 3.3M

Recommendation

  • 1.Forecast 16 RL/year: 16 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~39 days; expected demand during lead time 1.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 18.
  • 4.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 80% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single sourceAbnormal consumptionOpen POSame description as 6 other material numbers
On hand / on order
7 / 9
next delivery 02 Nov 2026
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
18
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.3M
PO history
ML early warning: 80% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 44 days ago, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (5 units) excluded from the baseline.

Demand pattern Lumpy · 20 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 2 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-101
CRACKING FURNACE BF-101
S483.02

Lead time and procurement

Lead time 39 ± 18 days (PO history, 7 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
19 Sept 2026PR03
Regular replenishment
9Rp 3.3M02 Nov 2026
open
44 d
02 Sept 2026PR03
Regular replenishment
11Rp 3.3M22 Sept 202620 d
29 Mar 2026PR03
Regular replenishment
15Rp 3.4M15 Apr 202617 d
28 Oct 2025PR03
Regular replenishment
6Rp 3.3M29 Nov 202532 d
06 Oct 2025PR03
Regular replenishment
12Rp 3.2M01 Nov 202526 d
19 Jul 2025PR06
Regular replenishment
17Rp 3.2M20 Aug 202532 d
17 May 2025PR04
Regular (other)
18Rp 3.4M06 Jul 202550 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
08 Aug 2026LowPX_BF-104[MSI-B-26-MZB-191] Permanent repair
04 Aug 2026MediumPX_BF-104Thermograph wall BF-104

Recent goods issues

Posting dateQtyOrderOrder type
18 Aug 20263201000030228Corrective
30 Jul 20261201000033262Corrective
06 Mar 20261201000004574Corrective
13 Feb 20261201000014730Corrective
03 Feb 20261201000013025Corrective
16 Jan 20261201000009258Corrective
13 Jan 20261201000036797Corrective
27 Dec 20252201000028079Corrective
21 Dec 20251201000015034Corrective
19 Dec 20251203000014056Turnaround
17 Dec 20251203000014056Turnaround
06 Dec 20251201000018149Corrective
26 Nov 20251203000009623Turnaround
18 Nov 20252201000036809Corrective
15 Nov 20251203000035490Turnaround