Sparely
DU

CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C

Material 4100075550 · CERAMIC FIBER · Plant 1000

ATransferCriticalStockout
Material
4100075550
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
PRIMA INSTRUMEN PERSADA PT
Lead time
56 d · P80 69 d
Unit price
Rp 1.4M

Recommendation

  • 1.Forecast 16 RL/year: 16 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~56 days; expected demand during lead time 2.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 23.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 23 needed.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 93% probability of demand in the next 90 days.
  • 7.Identical part 4100076053 holds spare stock: transfer 23 RL instead of buying — no purchase needed.
ML early warningLast turnaround used 1Single sourceAbnormal consumptionSame description as 7 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 8
Rec. Max
23
order qty 13
Service level
99.9%
stockout risk now 84%
Unit price
Rp 1.4M
PO history
ML early warning: 93% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 16 days ago, 41 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Intermittent · 10 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 3 functional locations

2 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A311442.86
PX_BF-104
CRACKING FURNACE BF-104
A42811.58
PX_BF-110
CRACKING FURNACE BF-110
S24114.58

Lead time and procurement

Lead time 56 ± 36 days (PO history, 7 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
15 Jun 2026PR03
Regular replenishment
4Rp 1.4M28 Aug 202674 d
18 Apr 2026PR03
Regular replenishment
5Rp 1.4M03 Jun 202646 d
02 Feb 2026PR06
Regular replenishment
5Rp 1.4M22 Feb 202620 d
17 Nov 2025PR01
Import / long-lead
4Rp 1.5M29 Mar 2026132 d
28 Sept 2025PR03
Regular replenishment
7Rp 1.4M26 Oct 202528 d
22 Jun 2025PR03
Regular replenishment
3Rp 1.4M12 Aug 202551 d
12 Jun 2025PR03
Regular replenishment
3Rp 1.4M18 Jul 202536 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
15 Sept 20261201000010235Corrective
13 Jul 20261201000034553Corrective
25 Jun 20264201000016931Corrective
19 Apr 20261205000007469Other maintenance
06 Apr 20261201000039783Corrective
17 Feb 20261201000034983Corrective
15 Jan 20261201000037218Corrective
31 Dec 20252201000001385Corrective
16 Dec 20251201000027804Corrective
10 Dec 20251201000022657Corrective
28 Nov 20251203000009623Turnaround