CERAMIC FIBER,BLANKET,25T,128KG/M3,1260C

Material 4100075587 · CERAMIC FIBER · Plant 1000

AReorderCriticalStockout
Material
4100075587
Category
CERAMIC FIBER
Base unit
RL
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
58 d · P80 79 d
Unit price
Rp 979,368

Recommendation

  • 1.Forecast 15 RL/year: 15 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~58 days; expected demand during lead time 2.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 26.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 26 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 75% probability of demand in the next 90 days.
Proposed purchase requisition
26 RL
Rp 25.5M · order by 01 Oct 2026
Expected arrival ≈ 58 days
ML early warningConvert to Stock ItemLast turnaround used 2Single sourceSame description as 6 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 8
Rec. Max
26
order qty 16
Service level
100.0%
stockout risk now 87%
Unit price
Rp 979,368
PO history
ML early warning: 75% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 37 days ago, 16 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern Intermittent · 16 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 2 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A27128.72
PX_BF-101
CRACKING FURNACE BF-101
S383.02

Lead time and procurement

Lead time 58 ± 34 days (PO history, 7 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
07 Mar 2026PR06
Regular replenishment
5Rp 979,36812 Apr 202636 d
13 Dec 2025PR06
Regular replenishment
3Rp 956,45620 Feb 202669 d
29 Nov 2025PR05
Project / turnaround
3Rp 955,67602 Apr 2026124 d
29 Oct 2025PR06
Regular replenishment
5Rp 1.0M21 Nov 202523 d
22 Jun 2025PR03
Regular replenishment
3Rp 996,77923 Jul 202531 d
18 Jun 2025PR06
Regular replenishment
9Rp 1.0M05 Aug 202548 d
24 May 2025PR06
Regular replenishment
6Rp 959,74613 Aug 202581 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
14 Aug 2026EmergencyPX_BF-102Thermograph wall BF-102
12 Aug 2026HighPX_BF-102Peep door broken BF-102

Recent goods issues

Posting dateQtyOrderOrder type
25 Aug 20261201000011526Corrective
10 Aug 20261204000027173Preventive
10 Jul 20262209000012005Other maintenance
24 Jun 20261201000001753Corrective
12 Jun 20261201000016515Corrective
10 Jun 20261209000008419Other maintenance
19 Apr 20262201000035039Corrective
14 Mar 20261201000019387Corrective
15 Feb 20261201000017413Corrective
18 Jan 20261201000022489Corrective
18 Jan 20261201000030708Corrective
14 Jan 20261201000025990Corrective
26 Dec 20251203000006078Turnaround
23 Dec 20251203000022966Turnaround
28 Nov 20251201000004723Corrective