CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C

Material 4100075597 · CERAMIC FIBER · Plant 1000

ATransferCriticalBelow reorder point
Material
4100075597
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 87 d
Unit price
Rp 1.3M (est.)

Recommendation

  • 1.Forecast 22 RL/year: 22 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 3.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 30.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 28 needed.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
  • 6.Identical part 4100076053 holds spare stock: transfer 28 RL instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 7 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 11
Rec. Max
30
order qty 16
Service level
99.9%
stockout risk now 68%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 69 days ago, 38 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 4 functional locations

3 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A47327.01
PX_BF-102
CRACKING FURNACE BF-102
A47128.72
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-108
CRACKING FURNACE BF-108
S3239.44

Lead time and procurement

Lead time 57 ± 31 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
24 Jul 20261201000022265Corrective