CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C
Material 4100075647 · CERAMIC FIBER · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100075647
- Category
- CERAMIC FIBER
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- MEGA ENERGI ABADI PT
- Lead time
- 58 d · P80 72 d
- Unit price
- Rp 1.2M
Recommendation
- 1.Forecast 7.6 RL/year: 7.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~58 days; expected demand during lead time 1.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 14.
- 4.On hand 3 + on order 0 is at or below the reorder point: 11 needed.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100076053 holds spare stock: transfer 11 RL instead of buying — no purchase needed.
Single sourceSame description as 7 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
14
order qty 8
Service level
100.0%
stockout risk now 3%
Unit price
Rp 1.2M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.
Installed on 3 functional locations
2 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 4 | 38 | 14.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 2 | 23 | 9.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 2 | 23 | 9.44 |
Lead time and procurement
Lead time 58 ± 27 days (PO history, 3 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Mar 2026 | PR05 Project / turnaround | 2 | Rp 1.2M | 05 Jun 2026 | 75 d |
| 29 Nov 2025 | PR06 Regular replenishment | 1 | Rp 1.2M | 04 Feb 2026 | 67 d |
| 26 May 2025 | PR03 Regular replenishment | 2 | Rp 1.2M | 28 Jun 2025 | 33 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Jan 2026 | 1 | 201000014201 | Corrective |
| 04 Aug 2025 | 1 | 201000018575 | Corrective |