CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C

Material 4100075647 · CERAMIC FIBER · Plant 1000

ATransferNormalSlow-moving
Material
4100075647
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
58 d · P80 72 d
Unit price
Rp 1.2M

Recommendation

  • 1.Forecast 7.6 RL/year: 7.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~58 days; expected demand during lead time 1.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 14.
  • 4.On hand 3 + on order 0 is at or below the reorder point: 11 needed.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100076053 holds spare stock: transfer 11 RL instead of buying — no purchase needed.
Single sourceSame description as 7 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
14
order qty 8
Service level
100.0%
stockout risk now 3%
Unit price
Rp 1.2M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 3 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A43814.58
PX_BF-111
CRACKING FURNACE BF-111
A2239.01
PX_BF-108
CRACKING FURNACE BF-108
S2239.44

Lead time and procurement

Lead time 58 ± 27 days (PO history, 3 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
22 Mar 2026PR05
Project / turnaround
2Rp 1.2M05 Jun 202675 d
29 Nov 2025PR06
Regular replenishment
1Rp 1.2M04 Feb 202667 d
26 May 2025PR03
Regular replenishment
2Rp 1.2M28 Jun 202533 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
10 Sept 2026MediumPX_BF-111Peep door broken BF-111

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 20261201000014201Corrective
04 Aug 20251201000018575Corrective