CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C
Material 4100075709 · CERAMIC FIBER · Plant 1000
ATransferCriticalBelow reorder point
- Material
- 4100075709
- Category
- CERAMIC FIBER
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 57 d · P80 87 d
- Unit price
- Rp 1.3M (est.)
Recommendation
- 1.Forecast 22 RL/year: 22 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~57 days; expected demand during lead time 3.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 28.
- 4.On hand 1 + on order 0 is at or below the reorder point: 27 needed.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
- 6.Identical part 4100076240, 4100076970 holds spare stock: transfer 27 RL instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 7 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
28
order qty 16
Service level
99.9%
stockout risk now 90%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 29 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.
Installed on 3 functional locations
3 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 4 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 5 | 71 | 28.72 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 3 | 23 | 9.01 |
Lead time and procurement
Lead time 57 ± 31 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jul 2026 | 2 | 201000028672 | Corrective |
| 04 Aug 2025 | 1 | 201000010514 | Corrective |