CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C

Material 4100075709 · CERAMIC FIBER · Plant 1000

ATransferCriticalBelow reorder point
Material
4100075709
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 87 d
Unit price
Rp 1.3M (est.)

Recommendation

  • 1.Forecast 22 RL/year: 22 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 3.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 28.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 27 needed.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
  • 6.Identical part 4100076240, 4100076970 holds spare stock: transfer 27 RL instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 7 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
28
order qty 16
Service level
99.9%
stockout risk now 90%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 29 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 3 functional locations

3 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A47327.01
PX_BF-102
CRACKING FURNACE BF-102
A57128.72
PX_BF-111
CRACKING FURNACE BF-111
A3239.01

Lead time and procurement

Lead time 57 ± 31 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112

Recent goods issues

Posting dateQtyOrderOrder type
08 Jul 20262201000028672Corrective
04 Aug 20251201000010514Corrective