CERAMIC FIBER,BLANKET,50T,96KG/M3,1260C
Material 4100075886 · CERAMIC FIBER · Plant 1000
ATransferCriticalSlow-moving
- Material
- 4100075886
- Category
- CERAMIC FIBER
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- MEGA ENERGI ABADI PT
- Lead time
- 45 d · P80 87 d
- Unit price
- Rp 861,294
Recommendation
- 1.Forecast 46 RL/year: 46 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~45 days; expected demand during lead time 5.7.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 50.
- 4.On hand 3 + on order 0 is at or below the reorder point: 47 needed.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100075634 holds spare stock: transfer 47 RL instead of buying — no purchase needed.
Single sourceSame description as 3 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 16
Rec. Max
50
order qty 29
Service level
99.9%
stockout risk now 57%
Unit price
Rp 861,294
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 293 days ago, 26 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.
Installed on 3 functional locations
2 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 5 | 73 | 27.01 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 2 | 29 | 11.58 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 3 | 41 | 14.58 |
Lead time and procurement
Lead time 45 ± 31 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jul 2025 | PR03 Regular replenishment | 1 | Rp 869,548 | 25 Aug 2025 | 32 d |
| 01 Jul 2025 | PR06 Regular replenishment | 2 | Rp 853,039 | 25 Jul 2025 | 24 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Dec 2025 | 3 | 201000021360 | Corrective |