Sparely
DU

CERAMIC FIBER,BLANKET,50T,128KG/M3,1430C

Material 4100076287 · CERAMIC FIBER · Plant 1000

AMonitorCritical insurance spare
Material
4100076287
Category
CERAMIC FIBER
Base unit
RL
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 87 d
Unit price
Rp 1.3M (est.)

Recommendation

  • 1.Forecast 3.1 RL/year: 3.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~57 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 2 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A48230.86
PX_BF-112
CRACKING FURNACE BF-112
A37327.01

Lead time and procurement

Lead time 57 ± 31 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106

Recent goods issues

Never issued in the 17-month history.