Sparely
DU

CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C

Material 4100076597 · CERAMIC FIBER · Plant 1000

ATransferNormalSlow-moving
Material
4100076597
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
61 d · P80 87 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 4.4 RL/year: 4.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~61 days; expected demand during lead time 0.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 8 needed.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100076970 holds spare stock: transfer 8 RL instead of buying — no purchase needed.
Single sourceSame description as 7 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
99.9%
stockout risk now 17%
Unit price
Rp 1.3M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 281 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~25 days.

Installed on 1 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A33814.58

Lead time and procurement

Lead time 61 ± 31 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2025PR01
Import / long-lead
1Rp 1.3M24 Nov 202574 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
26 Aug 2026MediumPX_BF-103Replace lamp as per PM finding
26 Aug 2026MediumPX_BF-103Hot spot at convection BF-103
03 Aug 2026MediumPX_BF-103Install scaffolding at BF-103
24 Jul 2026MediumPX_BF-103Thermograph wall BF-103
23 Jul 2026EmergencyPX_BF-103Decoking follow up BF-103

Recent goods issues

Posting dateQtyOrderOrder type
24 Dec 20251201000004131Corrective