CERAMIC FIBER,BLANKET,50T,128KG/M3,1260C

Material 4100076683 · CERAMIC FIBER · Plant 1000

STransferNormalSlow-moving
Material
4100076683
Category
CERAMIC FIBER
Base unit
RL
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 87 d
Unit price
Rp 1.3M (est.)

Recommendation

  • 1.Forecast 4.4 RL/year: 4.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 0.7.
  • 3.A 85.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 6.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 5 needed.
  • 5.Identical part 4100075418 holds spare stock: transfer 5 RL instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 6 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
6
order qty 5
Service level
85.0%
stockout risk now 15%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 258 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~25 days.

Installed on 1 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-110
CRACKING FURNACE BF-110
S44114.58

Lead time and procurement

Lead time 57 ± 31 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110
07 Aug 2026MediumPX_BF-110Painting BF-110

Recent goods issues

Posting dateQtyOrderOrder type
16 Jan 20261201000009933Corrective