BURNER TIP,SIZE CL10,INCOLOY

Material 4100077192 · BURNER TIP · Plant 1000

AReorderNormalBelow reorder point
Material
4100077192
Category
BURNER TIP
Base unit
EA
MRP type
Non Stock
Criticality
A (14 of 28 FuncLocs A/B)
Supplier
No PO history
Lead time
127 d · P80 204 d
Unit price
Rp 15.5M (est.)

Recommendation

  • 1.Forecast 51 EA/year: 51 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~127 days; expected demand during lead time 18.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 62.
  • 4.On hand 21 + on order 0 is at or below the reorder point: order 41 now.
  • 5.Installed on 28 FuncLoc(s), 14 of them criticality A/B.
Proposed purchase requisition
41 EA
Rp 635.2M · order by 01 Oct 2026
Expected arrival ≈ 127 days
Convert to Stock ItemAbnormal consumptionPrice estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 37
Rec. Max
62
order qty 8
Service level
99.9%
stockout risk now 39%
Unit price
Rp 15.5M
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 29 days ago, 125 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 6 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 46.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.

Installed on 28 functional locations

14 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_BF-104-BRN08
COIL OUTLET BF-104
A121.30
PX_BF-105-PD33
QO TO QUENCH FITTING
A121.30
PX_BF-101-BRN26
CONVECTION SECTION
B110.45

Lead time and procurement

Lead time 127 ± 68 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107

Recent goods issues

Posting dateQtyOrderOrder type
02 Sept 20261201000014482Corrective
18 Aug 20261201000002228Corrective
24 Jul 20262201000001320Corrective
23 Dec 20252201000024113Corrective
26 Nov 20251201000017397Corrective
19 May 20255201000024057Corrective