BURNER TIP,MODEL QE424,NBR

Material 4100077344 · BURNER TIP · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100077344
Category
BURNER TIP
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 7 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
114 d · P80 204 d
Unit price
Rp 32.1M

Recommendation

  • 1.Forecast 22 EA/year: 22 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~114 days; expected demand during lead time 6.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 23, order up to 27.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 27 now.
  • 5.Long lead time: 80% of deliveries took up to 204 days and the fastest seen in its category 79 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
27 EA
Rp 865.7M · order by 01 Oct 2026
Expected arrival ≈ 114 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
23
safety stock 17
Rec. Max
27
order qty 4
Service level
99.9%
stockout risk now 92%
Unit price
Rp 32.1M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 10 days ago, 50 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 37.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.

Installed on 7 functional locations

6 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_BF-112-COIL30
BURNER BF-112
A120.87
PX_BF-110-QF04
BURNER BF-110
A100.45
PX_BF-101-BRN26
CONVECTION SECTION
B310.45
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 114 ± 68 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
24 Feb 2026PR06
Regular replenishment
1Rp 32.9M11 Jun 2026107 d
07 Jul 2025PR04
Regular (other)
1Rp 31.2M28 Sept 202583 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20261201000022167Corrective
11 Jun 20261201000037853Corrective