BURNER TIP,MODEL UI462,SS316

Material 4100077580 · BURNER TIP · Plant 1000

AReorderCriticalBelow reorder point
Material
4100077580
Category
BURNER TIP
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
127 d · P80 204 d
Unit price
Rp 15.5M (est.)

Recommendation

  • 1.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~127 days; expected demand during lead time 4.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 21.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 20 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
20 EA
Rp 309.8M · order by 01 Oct 2026
Expected arrival ≈ 127 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 13
Rec. Max
21
order qty 4
Service level
99.9%
stockout risk now 82%
Unit price
Rp 15.5M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 22.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 127 ± 68 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026LowPX_BF-106Peep door broken BF-106
11 Sept 2026MediumPX_BF-110Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
26 Apr 20261201000031464Corrective