BURNER TIP,MODEL BB773,SS304

Material 4100077636 · BURNER TIP · Plant 1000

AMonitorInsurance gap
Material
4100077636
Category
BURNER TIP
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
127 d · P80 204 d
Unit price
Rp 15.5M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~127 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 25%
Unit price
Rp 15.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-111
CRACKING FURNACE BF-111
A1239.01

Lead time and procurement

Lead time 127 ± 68 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111

Recent goods issues

Never issued in the 17-month history.