BURNER TIP,TYPE ON116,SS316
Material 4100077965 · BURNER TIP · Plant 1000
AReduceSlow-moving
- Material
- 4100077965
- Category
- BURNER TIP
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 127 d · P80 204 d
- Unit price
- Rp 15.5M (est.)
Recommendation
- 1.Forecast 6.2 EA/year: 6.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~127 days; expected demand during lead time 2.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 11.
- 4.Stock 44 exceeds the level to keep (11) by 33.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
44 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 6
Rec. Max
11
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 15.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 339 days ago, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
Lead time and procurement
Lead time 127 ± 68 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
| 29 Aug 2026 | High | PX_BF-104 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Oct 2025 | 1 | 201000001795 | Corrective |