BURNER TIP,TYPE DV872,NBR
Material 4100078082 · BURNER TIP · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100078082
- Category
- BURNER TIP
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 127 d · P80 204 d
- Unit price
- Rp 15.5M (est.)
Recommendation
- 1.Forecast 2.4 EA/year: 2.4 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~127 days; expected demand during lead time 0.8.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 15.5M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 26 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1 | 8 | 3.02 |
Lead time and procurement
Lead time 127 ± 68 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.