BURNER TIP,TYPE JD686,SS304

Material 4100078422 · BURNER TIP · Plant 1000

ALong-leadMaintainCritical insurance spare
Material
4100078422
Category
BURNER TIP
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
KARYA SEJAHTERA NUSANTARA PT
Lead time
148 d · P80 204 d
Unit price
Rp 18.4M

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~148 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Long lead time: 80% of deliveries took up to 204 days and the fastest seen in its category 79 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 18.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A17327.01

Lead time and procurement

Lead time 148 ± 68 days (PO history + category, 1 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jul 2025PR03
Regular replenishment
2Rp 18.4M05 Feb 2026211 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking
17 Aug 2026MediumPX_BF-112Painting BF-112
15 Aug 2026LowPX_BF-112Decoking follow up BF-112

Recent goods issues

Never issued in the 17-month history.