BURNER TIP,SIZE RR239,SS304
Material 4100078484 · BURNER TIP · Plant 1000
ALong-leadMonitorInsurance gap
- Material
- 4100078484
- Category
- BURNER TIP
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN JAYA PT
- Lead time
- 131 d · P80 204 d
- Unit price
- Rp 12.3M
Recommendation
- 1.Forecast 1.6 EA/year: 1.6 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~131 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Long lead time: 80% of deliveries took up to 204 days and the fastest seen in its category 79 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 45%
Unit price
Rp 12.3M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 25 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~79 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
Lead time and procurement
Lead time 131 ± 68 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 May 2025 | PR06 Regular replenishment | 2 | Rp 12.3M | 07 Oct 2025 | 146 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
| 30 Aug 2026 | High | PX_BF-102 | Painting BF-102 |
Recent goods issues
Never issued in the 17-month history.