ANCHOR,REFRACTORY,SIZE ZA345,INCOLOY

Material 4100078994 · ANCHOR · Plant 1000

AMonitorCritical insurance spare
Material
4100078994
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 2,788 EA/year: 2,788 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~68 days; expected demand during lead time 516.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2,100, order up to 3,099.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 10 FuncLoc(s), 8 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
16 / 0
no open PO
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
2,100
safety stock 1,585
Rec. Max
3,099
order qty 999
Service level
99.9%
stockout risk now 77%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 111 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 10 functional locations

8 with criticality A/B · 8,877 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A1,50011442.86
PX_BF-106
CRACKING FURNACE BF-106
A508230.86
PX_BF-112
CRACKING FURNACE BF-112
A5,0377327.01
PX_BF-102
CRACKING FURNACE BF-102
A1,5007128.72
PX_BF-109
CRACKING FURNACE BF-109
A502911.58
PX_BF-104
CRACKING FURNACE BF-104
A502811.58
PX_BF-107
CRACKING FURNACE BF-107
A400239.01
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
PX_BF-110
CRACKING FURNACE BF-110
S1204114.58
PX_BF-108
CRACKING FURNACE BF-108
S120239.44

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing

Recent goods issues

Never issued in the 17-month history.