ANCHOR,REFRACTORY,SIZE ZA345,INCOLOY
Material 4100078994 · ANCHOR · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100078994
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 10 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 2,788 EA/year: 2,788 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~68 days; expected demand during lead time 516.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2,100, order up to 3,099.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 10 FuncLoc(s), 8 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
16 / 0
no open PO
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
2,100
safety stock 1,585
Rec. Max
3,099
order qty 999
Service level
99.9%
stockout risk now 77%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 111 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 10 functional locations
8 with criticality A/B · 8,877 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1,500 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 50 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 5,037 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1,500 | 71 | 28.72 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 50 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 50 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 400 | 23 | 9.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 50 | 23 | 9.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 120 | 41 | 14.58 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 120 | 23 | 9.44 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
Recent goods issues
Never issued in the 17-month history.