ANCHOR,REFRACTORY,SIZE MC296,SS304

Material 4100079016 · ANCHOR · Plant 1000

AReorderCriticalBelow reorder point
Material
4100079016
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 9,022 EA/year: 9,022 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~68 days; expected demand during lead time 1,669.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4,620, order up to 6,416.
  • 4.On hand 128 + on order 0 is at or below the reorder point: order 6,288 now.
  • 5.Installed on 8 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
6,288 EA
Rp 263.9M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Price estimatedLead time estimated
On hand / on order
128 / 0
no open PO
Today Min / Max
26 / 52
static parameters in BoM
Rec. Min (reorder point)
4,620
safety stock 2,952
Rec. Max
6,416
order qty 1,796
Service level
99.9%
stockout risk now 95%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 60 days ago, 97 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 25.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 8 functional locations

7 with criticality A/B · 13,694 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A1,50011442.86
PX_BF-106
CRACKING FURNACE BF-106
A1208230.86
PX_BF-102
CRACKING FURNACE BF-102
A4007128.72
PX_BF-103
CRACKING FURNACE BF-103
A5,0373814.58
PX_BF-104
CRACKING FURNACE BF-104
A1,5002811.58
PX_BF-107
CRACKING FURNACE BF-107
A50239.01
PX_BF-111
CRACKING FURNACE BF-111
A5,037239.01
PX_BF-108
CRACKING FURNACE BF-108
S50239.44

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111

Recent goods issues

Posting dateQtyOrderOrder type
02 Aug 2026200201000002940Corrective