ANCHOR,REFRACTORY,SIZE MC296,SS304
Material 4100079016 · ANCHOR · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100079016
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 9,022 EA/year: 9,022 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~68 days; expected demand during lead time 1,669.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4,620, order up to 6,416.
- 4.On hand 128 + on order 0 is at or below the reorder point: order 6,288 now.
- 5.Installed on 8 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
6,288 EA
Rp 263.9M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Price estimatedLead time estimated
On hand / on order
128 / 0
no open PO
Today Min / Max
26 / 52
static parameters in BoM
Rec. Min (reorder point)
4,620
safety stock 2,952
Rec. Max
6,416
order qty 1,796
Service level
99.9%
stockout risk now 95%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 60 days ago, 97 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 25.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 8 functional locations
7 with criticality A/B · 13,694 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1,500 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 120 | 82 | 30.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 400 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 5,037 | 38 | 14.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1,500 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 50 | 23 | 9.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 5,037 | 23 | 9.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 50 | 23 | 9.44 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Aug 2026 | 200 | 201000002940 | Corrective |