ANCHOR,REFRACTORY,SIZE TY222,A182F11

Material 4100079028 · ANCHOR · Plant 1000

AReorderNormalSlow-moving
Material
4100079028
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 3,303 EA/year: 3,303 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~68 days; expected demand during lead time 611.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,753, order up to 2,840.
  • 4.On hand 1,040 + on order 0 is at or below the reorder point: order 1,800 now.
  • 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
1,800 EA
Rp 75.6M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Price estimatedLead time estimated
On hand / on order
1,040 / 0
no open PO
Today Min / Max
39 / 111
static parameters in BoM
Rec. Min (reorder point)
1,753
safety stock 1,143
Rec. Max
2,840
order qty 1,087
Service level
99.9%
stockout risk now 12%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 200 days ago, 71 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 15.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 8 functional locations

6 with criticality A/B · 3,860 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A508230.86
PX_BF-112
CRACKING FURNACE BF-112
A507327.01
PX_BF-103
CRACKING FURNACE BF-103
A1203814.58
PX_BF-109
CRACKING FURNACE BF-109
A1,5002911.58
PX_BF-107
CRACKING FURNACE BF-107
A400239.01
PX_BF-111
CRACKING FURNACE BF-111
A120239.01
PX_BF-110
CRACKING FURNACE BF-110
S1,5004114.58
PX_BF-101
CRACKING FURNACE BF-101
S12083.02

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110

Recent goods issues

Posting dateQtyOrderOrder type
15 Mar 202650201000007030Corrective
27 Feb 2026200201000037279Corrective