ANCHOR,REFRACTORY,SIZE OB614,INCOLOY

Material 4100079034 · ANCHOR · Plant 1000

AMonitorHealthy
Material
4100079034
Category
ANCHOR
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 3,321 EA/year: 3,321 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~68 days; expected demand during lead time 614.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,835, order up to 2,925.
  • 4.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
2,067 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1,835
safety stock 1,221
Rec. Max
2,925
order qty 1,090
Service level
99.9%
stockout risk now 0%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 60 days ago, 63 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 19.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 6 functional locations

5 with criticality A/B · 14,974 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A40011442.86
PX_BF-112
CRACKING FURNACE BF-112
A1,5007327.01
PX_BF-103
CRACKING FURNACE BF-103
A1,5003814.58
PX_BF-109
CRACKING FURNACE BF-109
A5,0372911.58
PX_BF-107
CRACKING FURNACE BF-107
A1,500239.01
PX_BF-108
CRACKING FURNACE BF-108
S5,037239.44

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
02 Aug 2026100201000008499Corrective