ANCHOR,REFRACTORY,SIZE YM635,CS
Material 4100079068 · ANCHOR · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100079068
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 6,294 EA/year: 6,294 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~68 days; expected demand during lead time 1,164.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5,000, order up to 6,500.
- 4.On hand 1,000 + on order 0 is at or below the reorder point: order 5,500 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
5,500 EA
Rp 230.9M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Price estimatedLead time estimated
On hand / on order
1,000 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5,000
safety stock 3,836
Rec. Max
6,500
order qty 1,500
Service level
99.9%
stockout risk now 32%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 81 days ago, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 2 functional locations
2 with criticality A/B · 520 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-104 CRACKING FURNACE BF-104 | A | 120 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 400 | 23 | 9.01 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 08 Sept 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
| 29 Aug 2026 | High | PX_BF-104 | Leak from packing |
| 15 Aug 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 08 Aug 2026 | Low | PX_BF-104 | [MSI-B-26-MZB-191] Permanent repair |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Jul 2026 | 1,000 | 201000032968 | Corrective |