ANCHOR,REFRACTORY,TYPE LF931,PTFE

Material 4100079085 · ANCHOR · Plant 1000

AReorderCriticalTAM reserve
Material
4100079085
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 682 EA/year: 682 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~68 days; expected demand during lead time 126.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,050, order up to 1,544.
  • 4.On hand 14 + on order 0 is at or below the reorder point: order 1,530 now.
  • 5.Used only during the last turnaround (200 EA): keep it for the next one instead of treating it as slow-moving.
  • 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1,530 EA
Rp 64.2M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Last turnaround used 200Price estimatedLead time estimated
On hand / on order
14 / 0
no open PO
Today Min / Max
14 / 25
static parameters in BoM
Rec. Min (reorder point)
1,050
safety stock 924
Rec. Max
1,544
order qty 494
Service level
99.9%
stockout risk now 30%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (200 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

3 with criticality A/B · 6,657 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A1,5007327.01
PX_BF-109
CRACKING FURNACE BF-109
A5,0372911.58
PX_BF-111
CRACKING FURNACE BF-111
A120239.01

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109

Recent goods issues

Posting dateQtyOrderOrder type
21 Dec 2025200203000033807Turnaround