ANCHOR,REFRACTORY,SIZE VH605,NBR

Material 4100079098 · ANCHOR · Plant 1000

AMonitorCritical insurance spare
Material
4100079098
Category
ANCHOR
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 1,768 EA/year: 1,768 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~68 days; expected demand during lead time 327.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,750, order up to 2,545.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
1,410 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1,750
safety stock 1,423
Rec. Max
2,545
order qty 795
Service level
100.0%
stockout risk now 0%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 74 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 6 functional locations

5 with criticality A/B · 5,847 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A12011442.86
PX_BF-106
CRACKING FURNACE BF-106
A4008230.86
PX_BF-103
CRACKING FURNACE BF-103
A1203814.58
PX_BF-109
CRACKING FURNACE BF-109
A5,0372911.58
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
PX_BF-110
CRACKING FURNACE BF-110
S1204114.58

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105

Recent goods issues

Never issued in the 17-month history.