ANCHOR,REFRACTORY,SIZE VH605,NBR
Material 4100079098 · ANCHOR · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100079098
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (5 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 1,768 EA/year: 1,768 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~68 days; expected demand during lead time 327.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,750, order up to 2,545.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
1,410 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1,750
safety stock 1,423
Rec. Max
2,545
order qty 795
Service level
100.0%
stockout risk now 0%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 74 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 6 functional locations
5 with criticality A/B · 5,847 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 120 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 400 | 82 | 30.86 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 120 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 5,037 | 29 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 50 | 23 | 9.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 120 | 41 | 14.58 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
Recent goods issues
Never issued in the 17-month history.