ANCHOR,REFRACTORY,SIZE EJ410,GRAPHITE
Material 4100079343 · ANCHOR · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100079343
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 4,385 EA/year: 4,385 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~68 days; expected demand during lead time 811.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4,000, order up to 5,252.
- 4.On hand 251 + on order 0 is at or below the reorder point: order 5,001 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5,001 EA
Rp 209.9M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Price estimatedLead time estimated
On hand / on order
251 / 0
no open PO
Today Min / Max
97 / 269
static parameters in BoM
Rec. Min (reorder point)
4,000
safety stock 3,190
Rec. Max
5,252
order qty 1,252
Service level
99.9%
stockout risk now 56%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 246 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 1 functional locations
1 with criticality A/B · 120 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 120 | 38 | 14.58 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 26 Aug 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_BF-103 | Hot spot at convection BF-103 |
| 03 Aug 2026 | Medium | PX_BF-103 | Install scaffolding at BF-103 |
| 24 Jul 2026 | Medium | PX_BF-103 | Thermograph wall BF-103 |
| 23 Jul 2026 | Emergency | PX_BF-103 | Decoking follow up BF-103 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Jan 2026 | 1,000 | 201000024322 | Corrective |