ANCHOR,REFRACTORY,TYPE UL206,SS304
Material 4100079353 · ANCHOR · Plant 1000
AReorderNormalTAM reserve
- Material
- 4100079353
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 430 EA/year: 430 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~68 days; expected demand during lead time 80.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 700, order up to 1,092.
- 4.On hand 334 + on order 0 is at or below the reorder point: order 758 now.
- 5.Used only during the last turnaround (500 EA): keep it for the next one instead of treating it as slow-moving.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
758 EA
Rp 31.8M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Last turnaround used 500Price estimatedLead time estimated
On hand / on order
334 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
700
safety stock 621
Rec. Max
1,092
order qty 392
Service level
99.8%
stockout risk now 20%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (500 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 706.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 2 functional locations
1 with criticality A/B · 520 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 400 | 73 | 27.01 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 120 | 8 | 3.02 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 31 Aug 2026 | Medium | PX_BF-112 | Install cover plate for MCP cracking |
| 17 Aug 2026 | Medium | PX_BF-112 | Painting BF-112 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Dec 2025 | 500 | 203000033807 | Turnaround |