ANCHOR,REFRACTORY,TYPE QI914,NBR
Material 4100079372 · ANCHOR · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100079372
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 68 d · P80 81 d
- Unit price
- Rp 41,974 (est.)
Recommendation
- 1.Forecast 264 EA/year: 264 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~68 days; expected demand during lead time 49.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 700, order up to 1,050.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
156 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
700
safety stock 652
Rec. Max
1,050
order qty 350
Service level
100.0%
stockout risk now 13%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 434.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 2 functional locations
1 with criticality A/B · 170 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-107 CRACKING FURNACE BF-107 | A | 50 | 23 | 9.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 120 | 23 | 9.44 |
Lead time and procurement
Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 08 Sept 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 15 Aug 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 12 Aug 2026 | Medium | PX_BF-108 | Peep door broken BF-108 |
| 08 Aug 2026 | Low | PX_BF-107 | Cleaning burner BF-107 |
| 27 Jul 2026 | Low | PX_BF-108 | Cleaning burner BF-108 |
Recent goods issues
Never issued in the 17-month history.