Sparely
DU

ANCHOR,REFRACTORY,TYPE VU651,INCOLOY

Material 4100079413 · ANCHOR · Plant 1000

AMonitorInsurance gap
Material
4100079413
Category
ANCHOR
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 749 EA/year: 749 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~68 days; expected demand during lead time 139.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,050, order up to 1,568.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1,050
safety stock 912
Rec. Max
1,568
order qty 518
Service level
99.9%
stockout risk now 33%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

3 with criticality A/B · 11,574 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A5,0377128.72
PX_BF-103
CRACKING FURNACE BF-103
A5,0373814.58
PX_BF-111
CRACKING FURNACE BF-111
A1,500239.01

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102

Recent goods issues

Never issued in the 17-month history.