ANCHOR,REFRACTORY,TYPE KI455,SS304

Material 4100079546 · ANCHOR · Plant 1000

AReorderCriticalStockout
Material
4100079546
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN JAYA PT
Lead time
70 d · P80 76 d
Unit price
Rp 33,718

Recommendation

  • 1.Forecast 3,520 EA/year: 3,520 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~70 days; expected demand during lead time 673.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4,000, order up to 5,252.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5,252 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5,252 EA
Rp 177.1M · order by 01 Oct 2026
Expected arrival ≈ 70 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
39 / 103
static parameters in BoM
Rec. Min (reorder point)
4,000
safety stock 3,327
Rec. Max
5,252
order qty 1,252
Service level
99.9%
stockout risk now 49%
Unit price
Rp 33,718
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 254 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1,500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A1,5002811.58

Lead time and procurement

Lead time 70 ± 14 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
06 Feb 2026PR03
Regular replenishment
394Rp 32,95615 Apr 202668 d
20 Oct 2025PR06
Regular replenishment
317Rp 33,71826 Dec 202567 d
02 Oct 2025PR06
Regular replenishment
226Rp 34,28522 Dec 202581 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing
08 Aug 2026LowPX_BF-104[MSI-B-26-MZB-191] Permanent repair
04 Aug 2026MediumPX_BF-104Thermograph wall BF-104
04 Aug 2026MediumPX_BF-104Peep door broken BF-104
21 Jul 2026MediumPX_BF-104Hot spot at convection BF-104

Recent goods issues

Posting dateQtyOrderOrder type
20 Jan 20261,000201000037346Corrective