Sparely
DU

ANCHOR,REFRACTORY,MODEL SS521,A105

Material 4100079731 · ANCHOR · Plant 1000

SReorderHighSlow-moving
Material
4100079731
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
68 d · P80 81 d
Unit price
Rp 41,974 (est.)

Recommendation

  • 1.Forecast 141 EA/year: 141 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~68 days; expected demand during lead time 26.
  • 3.A 90.4% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 191.
  • 4.On hand 10 + on order 0 is at or below the reorder point: order 181 now.
Proposed purchase requisition
181 EA
Rp 7.6M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Price estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
8 / 18
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 24
Rec. Max
191
order qty 141
Service level
90.4%
stockout risk now 41%
Unit price
Rp 41,974
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 416 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~27 days.

Installed on 1 functional locations

0 with criticality A/B · 5,037 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-108
CRACKING FURNACE BF-108
S5,037239.44

Lead time and procurement

Lead time 68 ± 20 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Posting dateQtyOrderOrder type
11 Aug 202550201000021135Corrective