ANCHOR,REFRACTORY,MODEL KY515,INCOLOY

Material 4100079959 · ANCHOR · Plant 1000

AReorderCriticalCritical insurance spare
Material
4100079959
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
KARYA SEJAHTERA NUSANTARA PT
Lead time
87 d · P80 81 d
Unit price
Rp 65,589

Recommendation

  • 1.Forecast 982 EA/year: 982 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~87 days; expected demand during lead time 235.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,400, order up to 1,874.
  • 4.On hand 139 + on order 2 is at or below the reorder point: order 1,733 now.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
  • 7.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
1,733 EA
Rp 113.7M · order by 01 Oct 2026
Expected arrival ≈ 87 days
ML early warningSingle sourceOpen PO
On hand / on order
139 / 2
next delivery 05 Oct 2026
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
1,400
safety stock 1,166
Rec. Max
1,874
order qty 474
Service level
99.9%
stockout risk now 49%
Unit price
Rp 65,589
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 40 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

3 with criticality A/B · 570 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A4008230.86
PX_BF-102
CRACKING FURNACE BF-102
A507128.72
PX_BF-111
CRACKING FURNACE BF-111
A120239.01

Lead time and procurement

Lead time 87 ± 20 days (PO history + category, 2 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jul 2026PR04
Regular (other)
2Rp 64,80805 Oct 2026
open
81 d
08 Nov 2025PR03
Regular replenishment
1Rp 66,37010 Apr 2026153 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
10 Sept 2026MediumPX_BF-111Peep door broken BF-111

Recent goods issues

Never issued in the 17-month history.