ANCHOR,REFRACTORY,MODEL KY515,INCOLOY
Material 4100079959 · ANCHOR · Plant 1000
AReorderCriticalCritical insurance spare
- Material
- 4100079959
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- KARYA SEJAHTERA NUSANTARA PT
- Lead time
- 87 d · P80 81 d
- Unit price
- Rp 65,589
Recommendation
- 1.Forecast 982 EA/year: 982 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~87 days; expected demand during lead time 235.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,400, order up to 1,874.
- 4.On hand 139 + on order 2 is at or below the reorder point: order 1,733 now.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
- 7.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
1,733 EA
Rp 113.7M · order by 01 Oct 2026
Expected arrival ≈ 87 days
ML early warningSingle sourceOpen PO
On hand / on order
139 / 2
next delivery 05 Oct 2026
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
1,400
safety stock 1,166
Rec. Max
1,874
order qty 474
Service level
99.9%
stockout risk now 49%
Unit price
Rp 65,589
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 40 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 3 functional locations
3 with criticality A/B · 570 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 400 | 82 | 30.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 50 | 71 | 28.72 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 120 | 23 | 9.01 |
Lead time and procurement
Lead time 87 ± 20 days (PO history + category, 2 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jul 2026 | PR04 Regular (other) | 2 | Rp 64,808 | 05 Oct 2026 open | 81 d |
| 08 Nov 2025 | PR03 Regular replenishment | 1 | Rp 66,370 | 10 Apr 2026 | 153 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
Recent goods issues
Never issued in the 17-month history.