ANCHOR,REFRACTORY,TYPE GT110,INCOLOY
Material 4100080096 · ANCHOR · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100080096
- Category
- ANCHOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- MEGA ENERGI ABADI PT
- Lead time
- 56 d · P80 81 d
- Unit price
- Rp 13,224
Recommendation
- 1.Forecast 3,950 EA/year: 3,950 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~56 days; expected demand during lead time 609.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3,000, order up to 5,117.
- 4.On hand 137 + on order 0 is at or below the reorder point: order 4,980 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4,980 EA
Rp 65.9M · order by 01 Oct 2026
Expected arrival ≈ 56 days
Single source
On hand / on order
137 / 0
no open PO
Today Min / Max
85 / 146
static parameters in BoM
Rec. Min (reorder point)
3,000
safety stock 2,391
Rec. Max
5,117
order qty 2,117
Service level
100.0%
stockout risk now 70%
Unit price
Rp 13,224
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 305 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 1 functional locations
1 with criticality A/B · 1,500 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1,500 | 73 | 27.01 |
Lead time and procurement
Lead time 56 ± 20 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Aug 2026 | PR03 Regular replenishment | 161 | Rp 12,937 | 24 Aug 2026 | 22 d |
| 27 May 2026 | PR06 Regular replenishment | 234 | Rp 13,510 | 23 Jul 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 31 Aug 2026 | Medium | PX_BF-112 | Install cover plate for MCP cracking |
| 17 Aug 2026 | Medium | PX_BF-112 | Painting BF-112 |
| 15 Aug 2026 | Low | PX_BF-112 | Decoking follow up BF-112 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Nov 2025 | 500 | 201000016373 | Corrective |