ANCHOR,REFRACTORY,TYPE GT110,INCOLOY

Material 4100080096 · ANCHOR · Plant 1000

AReorderCriticalSlow-moving
Material
4100080096
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
56 d · P80 81 d
Unit price
Rp 13,224

Recommendation

  • 1.Forecast 3,950 EA/year: 3,950 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~56 days; expected demand during lead time 609.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3,000, order up to 5,117.
  • 4.On hand 137 + on order 0 is at or below the reorder point: order 4,980 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4,980 EA
Rp 65.9M · order by 01 Oct 2026
Expected arrival ≈ 56 days
Single source
On hand / on order
137 / 0
no open PO
Today Min / Max
85 / 146
static parameters in BoM
Rec. Min (reorder point)
3,000
safety stock 2,391
Rec. Max
5,117
order qty 2,117
Service level
100.0%
stockout risk now 70%
Unit price
Rp 13,224
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 305 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1,500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A1,5007327.01

Lead time and procurement

Lead time 56 ± 20 days (PO history + category, 2 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
02 Aug 2026PR03
Regular replenishment
161Rp 12,93724 Aug 202622 d
27 May 2026PR06
Regular replenishment
234Rp 13,51023 Jul 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking
17 Aug 2026MediumPX_BF-112Painting BF-112
15 Aug 2026LowPX_BF-112Decoking follow up BF-112

Recent goods issues

Posting dateQtyOrderOrder type
30 Nov 2025500201000016373Corrective