ANCHOR,REFRACTORY,TYPE GV126,A182F11

Material 4100080445 · ANCHOR · Plant 1000

SReduceSlow-moving
Material
4100080445
Category
ANCHOR
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI ABADI PT
Lead time
58 d · P80 81 d
Unit price
Rp 50,230

Recommendation

  • 1.Forecast 14,536 EA/year: 14,536 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~58 days; expected demand during lead time 2,306.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 678 exceeds the level to keep (0) by 678.
Convert to Non StockSingle source
On hand / on order
678 / 0
no open PO
Today Min / Max
336 / 857
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 37%
Unit price
Rp 50,230
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 254 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~27 days.

Installed on 1 functional locations

0 with criticality A/B · 1,500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-108
CRACKING FURNACE BF-108
S1,500239.44

Lead time and procurement

Lead time 58 ± 20 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
23 Aug 2026PR03
Regular replenishment
1,620Rp 50,23021 Sept 202629 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Posting dateQtyOrderOrder type
20 Jan 20265,000201000014201Corrective