BEARING,JOURNAL,TYPE MU467,NBR
Material 4100080654 · BEARING · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100080654
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (17 of 23 FuncLocs A/B)
- Supplier
- GEMILANG REFRAKTORI JAYA PT
- Lead time
- 111 d · P80 127 d
- Unit price
- Rp 178.0M
Recommendation
- 1.Forecast 13 SET/year: 10 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
- 2.Lead time ~111 days; expected demand during lead time 3.1.
- 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 10.
- 4.On hand 5 + on order 2 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 23 FuncLoc(s), 17 of them criticality A/B.
- 7.ML early warning: 31% probability of demand in the next 90 days.
Proposed purchase requisition
3 SET
Rp 533.9M · order by 01 Oct 2026
Expected arrival ≈ 111 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
5 / 2
next delivery 11 Sept 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 5
Rec. Max
10
order qty 2
Service level
99.1%
stockout risk now 3%
Unit price
Rp 178.0M
PO history
ML early warning: 31% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 23 functional locations
17 with criticality A/B · 34 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-717 FLUSHING OIL COMPRESSOR | A | 1 | 9 | 4.00 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-226 HYDROGEN AIR COMPRESSOR | A | 1 | 6 | 2.28 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PX_KC-279C C3 RECYCLE COMPRESSOR | A | 1 | 3 | 1.43 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KT-513 TURBINE FOR KC-513 | A | 2 | 2 | 1.53 |
| PY_KC-636C SLOP OIL COMPRESSOR | A | 3 | 1 | 0.57 |
| PX_KC-178A QUENCH OIL FAN | A | 1 | 0 | 0.57 |
| PX_KC-618B WASH WATER BLOWER | A | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 111 ± 40 days (PO history + category, 1 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Jul 2026 | PR06 Regular replenishment | 2 | Rp 176.0M | 11 Sept 2027 open | 416 d |
| 18 Jul 2025 | PR03 Regular replenishment | 1 | Rp 179.9M | 23 Apr 2026 | 279 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Aug 2027 | PX_KC-620A | Compressor major overhaul | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 21 Sept 2026 | Low | PX_KC-717 | Leak from packing |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 16 Sept 2026 | Medium | PX_KC-891A | KC-891A high vibration |
| 11 Sept 2026 | Low | PX_KC-225D | KC-225D lube oil filter DP high |
| 07 Sept 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 05 Sept 2026 | Medium | PX_KC-279C | Overhaul |
| 05 Sept 2026 | Low | PX_KC-513 | Inspect coupling KC-513 |
| 03 Sept 2026 | Low | PX_KC-226 | KC-226 bearing temp high |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Jan 2026 | 1 | 201000009803 | Corrective |
| 10 Sept 2025 | 1 | 201000029989 | Corrective |