Sparely
DU

BEARING,JOURNAL,TYPE MU467,NBR

Material 4100080654 · BEARING · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100080654
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (17 of 23 FuncLocs A/B)
Supplier
GEMILANG REFRAKTORI JAYA PT
Lead time
111 d · P80 127 d
Unit price
Rp 178.0M

Recommendation

  • 1.Forecast 13 SET/year: 10 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~111 days; expected demand during lead time 3.1.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 10.
  • 4.On hand 5 + on order 2 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 23 FuncLoc(s), 17 of them criticality A/B.
  • 7.ML early warning: 31% probability of demand in the next 90 days.
Proposed purchase requisition
3 SET
Rp 533.9M · order by 01 Oct 2026
Expected arrival ≈ 111 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
5 / 2
next delivery 11 Sept 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 5
Rec. Max
10
order qty 2
Service level
99.1%
stockout risk now 3%
Unit price
Rp 178.0M
PO history
ML early warning: 31% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 23 functional locations

17 with criticality A/B · 34 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-317B
RICH AMINE FAN
A141.85
PX_KC-279C
C3 RECYCLE COMPRESSOR
A131.43
PX_KC-464A
CONDENSATE BLOWER
A121.43
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-513
TURBINE FOR KC-513
A221.53
PY_KC-636C
SLOP OIL COMPRESSOR
A310.57
PX_KC-178A
QUENCH OIL FAN
A100.57
PX_KC-618B
WASH WATER BLOWER
A100.57

Lead time and procurement

Lead time 111 ± 40 days (PO history + category, 1 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
22 Jul 2026PR06
Regular replenishment
2Rp 176.0M11 Sept 2027
open
416 d
18 Jul 2025PR03
Regular replenishment
1Rp 179.9M23 Apr 2026279 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Aug 2027PX_KC-620ACompressor major overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026MediumPX_KC-513KC-513 high vibration
21 Sept 2026LowPX_KC-717Leak from packing
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
11 Sept 2026LowPX_KC-225DKC-225D lube oil filter DP high
07 Sept 2026MediumPX_KC-513Inspect coupling KC-513
05 Sept 2026MediumPX_KC-279COverhaul
05 Sept 2026LowPX_KC-513Inspect coupling KC-513
03 Sept 2026LowPX_KC-226KC-226 bearing temp high
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
11 Jan 20261201000009803Corrective
10 Sept 20251201000029989Corrective