BEARING,JOURNAL,SIZE SV126,INCOLOY
Material 4100080671 · BEARING · Plant 1000
ALong-leadReorderCriticalBelow reorder point
- Material
- 4100080671
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (4 of 14 FuncLocs A/B)
- Supplier
- RAJAWALI SARANA PERSADA PT
- Lead time
- 156 d · P80 308 d
- Unit price
- Rp 597.5M
Recommendation
- 1.Forecast 9.5 SET/year: 9.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~156 days; expected demand during lead time 4.1.
- 3.A 96.2% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 11.
- 4.On hand 1 + on order 1 is at or below the reorder point: order 9 now.
- 5.Long lead time: 80% of deliveries took up to 308 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 14 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 5.4B · order by 01 Oct 2026
Expected arrival ≈ 156 days
Needs Management sign-off before it reaches the PR draft
Long-leadLast turnaround used 1Single sourceOpen PO
On hand / on order
1 / 1
next delivery 28 Feb 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 6
Rec. Max
11
order qty 1
Service level
96.2%
stockout risk now 73%
Unit price
Rp 597.5M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 66 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 14 functional locations
4 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-854C FEED FAN | A | 1 | 7 | 2.28 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-391D QUENCH WATER COMPRESSOR | A | 1 | 2 | 1.43 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KC-513 WASH WATER BLOWER | S | 1 | 10 | 4.42 |
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
| PX_KC-891A HYDROGEN FAN | S | 1 | 5 | 1.85 |
| PX_KC-830D FLUSHING OIL BLOWER | S | 1 | 4 | 1.85 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
| PX_KC-216B LEAN AMINE FAN | S | 1 | 1 | 0.57 |
Lead time and procurement
Lead time 156 ± 67 days (PO history, 3 PO lines) · on-time 9%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Jul 2026 | PR03 Regular replenishment | 1 | Rp 604.6M | 28 Feb 2027 open | 226 d |
| 15 Mar 2026 | PR03 Regular replenishment | 1 | Rp 586.4M | 13 Sept 2026 | 182 d |
| 06 Jun 2025 | PR06 Regular replenishment | 2 | Rp 597.5M | 04 Jun 2026 | 363 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 22 Sept 2026 | Medium | PX_KC-854C | Overhaul |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 16 Sept 2026 | Medium | PX_KC-891A | KC-891A high vibration |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 07 Sept 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 05 Sept 2026 | Low | PX_KC-513 | Inspect coupling KC-513 |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jul 2026 | 1 | 201000009431 | Corrective |
| 26 Dec 2025 | 1 | 203000006078 | Turnaround |