BEARING,JOURNAL,SIZE SV126,INCOLOY

Material 4100080671 · BEARING · Plant 1000

ALong-leadReorderCriticalBelow reorder point
Material
4100080671
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 14 FuncLocs A/B)
Supplier
RAJAWALI SARANA PERSADA PT
Lead time
156 d · P80 308 d
Unit price
Rp 597.5M

Recommendation

  • 1.Forecast 9.5 SET/year: 9.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~156 days; expected demand during lead time 4.1.
  • 3.A 96.2% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 11.
  • 4.On hand 1 + on order 1 is at or below the reorder point: order 9 now.
  • 5.Long lead time: 80% of deliveries took up to 308 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 14 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 5.4B · order by 01 Oct 2026
Expected arrival ≈ 156 days
Needs Management sign-off before it reaches the PR draft
Long-leadLast turnaround used 1Single sourceOpen PO
On hand / on order
1 / 1
next delivery 28 Feb 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 6
Rec. Max
11
order qty 1
Service level
96.2%
stockout risk now 73%
Unit price
Rp 597.5M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 66 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 14 functional locations

4 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-854C
FEED FAN
A172.28
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-391D
QUENCH WATER COMPRESSOR
A121.43
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KC-513
WASH WATER BLOWER
S1104.42
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KC-891A
HYDROGEN FAN
S151.85
PX_KC-830D
FLUSHING OIL BLOWER
S141.85
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KC-150A
HYDROGEN FAN
S121.00
PX_KC-216B
LEAN AMINE FAN
S110.57

Lead time and procurement

Lead time 156 ± 67 days (PO history, 3 PO lines) · on-time 9%

PR dateTypeQtyUnit priceDeliveryLead time
17 Jul 2026PR03
Regular replenishment
1Rp 604.6M28 Feb 2027
open
226 d
15 Mar 2026PR03
Regular replenishment
1Rp 586.4M13 Sept 2026182 d
06 Jun 2025PR06
Regular replenishment
2Rp 597.5M04 Jun 2026363 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026MediumPX_KC-513KC-513 high vibration
22 Sept 2026MediumPX_KC-854COverhaul
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
07 Sept 2026MediumPX_KC-513Inspect coupling KC-513
05 Sept 2026LowPX_KC-513Inspect coupling KC-513
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
27 Jul 20261201000009431Corrective
26 Dec 20251203000006078Turnaround