BEARING,JOURNAL,MODEL AM99,INCOLOY
Material 4100080702 · BEARING · Plant 1000
AMaintainCritical insurance spare
- Material
- 4100080702
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (7 of 11 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 219.3M (est.)
Recommendation
- 1.Forecast 0.8 SET/year: 0.8 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.1.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 11 FuncLoc(s), 7 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.3%
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 405.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 11 functional locations
7 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-226 HYDROGEN AIR COMPRESSOR | A | 1 | 6 | 2.28 |
| PX_KC-732D METHANOL COMPRESSOR | A | 1 | 6 | 3.14 |
| PX_KC-106B GASOLINE BLOWER | A | 1 | 2 | 1.00 |
| PX_KC-435A FUEL OIL AIR COMPRESSOR | A | 1 | 2 | 1.00 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PX_KT-308B TURBINE FOR KC-308B | A | 4 | 0 | 1.10 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_KT-624A TURBINE FOR KC-624A | S | 1 | 3 | 2.39 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 03 Sept 2026 | Low | PX_KC-226 | KC-226 bearing temp high |
| 21 Aug 2026 | Low | PX_KC-226 | KC-226 high vibration |
| 26 Jul 2026 | Medium | PX_KC-732D | KC-732D bearing temp high |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 11 Feb 2026 | Low | PX_KC-106B | KC-106B high vibration |
| 07 Feb 2026 | Medium | PX_KT-624A | Replace lamp as per PM finding |
| 16 Jan 2026 | Low | PX_KC-226 | KC-226 bearing temp high |
Recent goods issues
Never issued in the 17-month history.