BEARING,JOURNAL,TYPE SB139,SS304

Material 4100080712 · BEARING · Plant 1000

AReduceNon-moving
Material
4100080712
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 1.6 SET/year: 0.9 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 0.1.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 6 exceeds the level to keep (2) by 4.
  • 5.Installed on 9 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.2%
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 441.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 9 functional locations

3 with criticality A/B · 15 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-536A
LUBE OIL BLOWER
A1114.42
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KC-575B
METHANE COMPRESSOR
S172.71
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KC-879A
CONDENSATE FAN
S462.71
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KC-216B
LEAN AMINE FAN
S410.57
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
24 Sept 2026LowPX_KC-879AInspect coupling KC-879A
22 Sept 2026HighPX_KC-536AOverhaul
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
07 Sept 2026MediumPX_KC-879AReplace lamp as per PM finding
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
08 Aug 2026HighPX_KC-536AKC-536A bearing temp high

Recent goods issues

Never issued in the 17-month history.