BEARING,JOURNAL,MODEL JQ811,A182F11

Material 4100080732 · BEARING · Plant 1000

AReorderNormalSlow-moving
Material
4100080732
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 5.5 SET/year: 5.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.8.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 219.3M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.0%
stockout risk now 1%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 6 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-452
HYDROGEN FAN
A162.71
PX_KC-447
LUBE OIL COMPRESSOR
A141.85
PX_KC-397A
DILUTION STEAM FAN
A110.57
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KC-773A
REFLUX COMPRESSOR
S1259.99
PX_KT-624A
TURBINE FOR KC-624A
S232.39

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026EmergencyPX_KC-773AInspect coupling KC-773A
15 Sept 2026LowPX_KC-773AInstall scaffolding at KC-773A
05 Sept 2026MediumPX_KC-452Overhaul
05 Sept 2026MediumPX_KC-452Inspect coupling KC-452
23 Aug 2026LowPX_KC-773AKC-773A bearing temp high
17 Aug 2026MediumPX_KC-447Leak from packing
10 Aug 2026LowPX_KC-773AKC-773A high vibration
09 Aug 2026MediumPX_KC-773AInspect coupling KC-773A
03 Aug 2026MediumPX_KC-773ALeak from packing
20 Jul 2026MediumPX_KC-773AKC-773A high vibration

Recent goods issues

Posting dateQtyOrderOrder type
25 Jan 20261201000028000Corrective