BEARING,JOURNAL,SIZE AU67,SS304

Material 4100080753 · BEARING · Plant 1000

AReorderNormalSlow-moving
Material
4100080753
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 4.5 SET/year: 3.1 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 0.5.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 219.3M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
98.8%
stockout risk now 1%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 222 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 7 functional locations

3 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PY_KC-636C
SLOP OIL COMPRESSOR
A410.57
PX_KC-422A
C4 PRODUCT BLOWER
S162.71
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KC-505D
METHANE COMPRESSOR
S111.00
PX_KC-210D
ETHYLENE BLOWER
S200.57

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
07 Jul 2027PX_KC-505DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jul 2026MediumPX_KC-422AKC-422A high vibration
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
03 Mar 2026LowPX_KC-422ALeak from packing
20 Jan 2026LowPX_KC-422ALeak from packing
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
21 Feb 20261201000019323Corrective
01 Jan 20261201000005143Corrective