BEARING,JOURNAL,TYPE PW729,SS304
Material 4100080809 · BEARING · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100080809
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- RAJAWALI REFRAKTORI PRATAMA PT
- Lead time
- 119 d · P80 127 d
- Unit price
- Rp 242.1M
Recommendation
- 1.Forecast 5.2 SET/year: 4.5 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~119 days; expected demand during lead time 2.2 (incl. 0.7 planned).
- 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 6.
- 4.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 60% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceOpen POPlanned demand in lead time
On hand / on order
2 / 4
next delivery 04 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 3
Rec. Max
6
order qty 1
Service level
98.3%
stockout risk now 0%
Unit price
Rp 242.1M
PO history
ML early warning: 60% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 81 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PX_KC-752A CONDENSATE BLOWER | A | 1 | 4 | 1.85 |
| PX_KC-235D DEMIN WATER FAN | A | 1 | 2 | 1.00 |
| PX_KC-371B BOTTOM FAN | B | 1 | 0 | 0.57 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KC-422A C4 PRODUCT BLOWER | S | 1 | 6 | 2.71 |
Lead time and procurement
Lead time 119 ± 40 days (PO history + category, 2 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Aug 2026 | PR06 Regular replenishment | 2 | Rp 242.2M | 24 May 2027 open | 286 d |
| 11 Jun 2026 | PR05 Project / turnaround | 2 | Rp 242.0M | 04 Nov 2026 open | 146 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_KC-235D | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KC-422A | KC-422A high vibration |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 04 Jul 2026 | Low | PX_KC-317B | Replace lamp as per PM finding |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Medium | PX_KC-317B | KC-317B lube oil filter DP high |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 14 Mar 2026 | Medium | PX_KT-447 | KT-447 steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Jul 2026 | 1 | 201000020631 | Corrective |