Sparely
DU

BEARING,JOURNAL,SIZE TZ741,SS316

Material 4100080999 · BEARING · Plant 1000

AReorderCriticalStockout
Material
4100080999
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 3.9 SET/year: 0.4 unplanned (installed-base failure prior (no history)) + 3.6 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 438.5M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 5%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 174.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 7 functional locations

2 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KC-563B
GASOLINE COMPRESSOR
B100.57
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KC-505D
METHANE COMPRESSOR
S411.00
PX_KC-511C
FUEL OIL FAN
S110.57
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
07 Jul 2027PX_KC-505DCompressor major overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
24 Jul 2025MediumPX_KC-511CInstall scaffolding at KC-511C
21 Jun 2025HighPX_KC-505DRepair insulation KC-505D
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A

Recent goods issues

Never issued in the 17-month history.